WickedForGood Methodology.pdf
Wicked: For Good — Methodology Overview
A three-layer forecasting system combining historical comps, AI visibility signals, and ensemble modeling.
AI visibility signals consistently move 7–12 days before traditional tracking, enabling earlier detection of demand shifts.
Three-Layer Forecasting Framework
Historical Performance Models
- Normalized performance curves
- Domestic ↔ global ratios
- Holiday corridor uplift
- Trailer shock elasticity
- Release pattern seasonality
AI Visibility Metrics
- SoP (Share-of-Prompt)
- AI Signals
- Prompt
- Density
- Sentiment
- Media reference velocity
- Cross-model consistency checks
- No search, no presales curves, no exhibitor data, no leaks, no surveys, no
Ensemble Forecasting Engine
- Multi-model ensemble tuned for AI visibility
- Cross-signal weighting & stability controls
- Temporal calibration for release cycles
- Confidence interval calibration
Forecasting Pipeline
Historical Comps
300+ theatrical titles
AI Visibility Signals
LLM visibility
Ensemble Model
Multi-model blend
Forecast Output
emberos projected $XXM
Each stage feeds normalized features into the multi-model ensemble for unified forecast output.
Data Input Layers
Visibility Layer
SoP, SSI, PDI
| Category | Sentiment, trailer views, media velocity |
|---|---|
| Sentiment | 0.75 |
| Trailer | 1.0 |
| Media | 0.5 |
Context Layer
Stable market factors that influence baseline demand before AI visibility signals are applied.
Release Landscape
! These inputs act as normalization anchors so the model doesn't overreact to short-term AI or buzz fluctuations.
Stability / Variance
| Category | Stable / High variance |
|---|---|
| unlabelled 1 | 0.33 |
External factors such as reviews, competition, and weather introduce variance not captured directly within AI visibility signals. Reach out to sales@emberos.ai if you'd like to deeper into this.
- Forecast lock #1: Nov 14, 2025, 12PM PT
- Forecast lock #2: Nov 20, 2025, 12PM PT
- No model edits post-freeze
- Outputs timestamped + archived
This protocol prevents any modification to the forecast after freeze, ensuring integrity and independent verification.